3. Material and Equipment List
3.1 Material List (Omdurman Prices October, 2008)
No. Descriptions
Unit
Price per
Unit SDG
1 Mud to be beaten for green brick
m3
10
2 Muna (clay and water) to tie up the brick m³
10
3 Sand (fine)
m3 15
4 Donkey dung and straw mix
sack
6
5 Cement
sack
35
6 Wire mesh (arnab)
3 meter roll
45
7 Sand (coarse)
m3 15
8 Steel ring clamp for Dome Roof support One piece
250
9 Asphalt for plastering
tin 35
10 Arch door 2 x 1 meters
1 300
11 Arch window 80 x 60 cm
1 frame
100
12 Chimney (Metal roof cover)
1
50
13 Lime (internal plastering)
1 sack
6
14 Gum Powder
kg 8
15 Water
barrel
3
Amount
20
10
8
10
6 x 50 kg
1
6
1
3
1
1
1
1
5
50
Total
Total SDG
200
100
120
60
210
45
90
250
105
300
100
50
6
40
150
1826
10
Practical Answers Sudan
The Construction of the Timberless House Model